Search this site
For quiries and feedback please contact us on email WAJwebteam@mwi.gov.jo or phone number +962 6 5680100 ext 1338
Water Authority of Jordan > Tenders
Construction of the Ramtha WWTP Expansion / Tender No. 58/2019/SW 
    
  The participate list
  • JV. KTK Environment Group & Manasrah contracting
  • JV. Societe Egyptienne & Ahmad yousef AL - Tarawneh
  • ATCCO & vinci
  • JV. Hussein Atieh & Passavant
  • Sorensen Gross & Fuad Abu Hamdan
  • JV. The arab contracting (Osman ahmad Osman)&Alderah
  • JV. Strabag & Lawzi
  • JV. Metito & Razel
  • Butec –EMIT-Masar
  • JV : Kuzu – MID - Gibraltar
   
View: 
CONSULTANCY FOR PROJECT IMPLEMENTATION South-East Amman - Jordan
36/2020/SW
Improvement of the Energy Efficiency in the Water Sector -Rehabilitation of existing Pump Stations and Reconstruction of the Primary and Secondary Water System in As Salt / Jordan
13/2020/SW
Implementation for Works under the Improved Access to Water, Water Distribution Performance and Related Sewerage Disposal in Irbid Governorate for Host Communities and Syrian Refugees Component A / Package 2 – Remaining Works in Greater Irbid and Ramtha –
26/2020/SW
Prequalification for construction of the Ramtha WWTP Expansion
58/2019/SW
Consulting Services for the preparation of a Feasibility Study Groundwater Desalination Project
9/2020/SW
Supervision of Construction for Ramtha Wastewater Treatment Plant (Design & Build Project)
50/2019/SW
Water Loss Reduction Programme / Consulting Services for Feasibility Study
3/2020/SW
Review of Existing Feasibility Study, Detailed Design and Tender Documents and Supervision of Construction for Wastewater Collection Network in the Ramtha
51/2019/SW
Climate Change Mitigation Measures in the Wastewater Sector in Jordan Phase 2
27/2019/SW
Energy Efficiency and Renewable Energy in the Water Sector IV
38/2019/SW
Improving Energy Efficiency through Electricity Generation from Biogas in Wastewater Treatment Plants
34/2019/SW
WEST IRBID WASTEWATER NETWORK PROJECT
WAJ /55/2019
CONSTRUCTION OF A Two-stage Constructed Wetland for Sewage Treatment at Al-Azraq Town UNDER THE PROJECT Sanitation Solutions for Underserved Communities in Jordan
57/2019/SW
The development of the Hisban Water Desalination and Conveyance Project On a Build, Operate and Transfer (BOT) basis
49/2019/SW
for the construction of wastewater collection system Um AL-Enaj
م/59/2019/اشغال دائرة
Solar Energy 24 MWp Photovoltaic Generation System located in Disi Area
95/2017/SW
INVITATION FOR PREQUALIFICATION Supply and installation of Pumping Stations and Force Mains, in West Irbid Towns
45/2019/SW
Construction of the Wastewater Conveyor from Ain Ghazal Pre-Treatment Plant to As-Samra Wastewater Treatment Plant project
25/2019/SW
IMPLEMENTATION OF PRIORITISED INVESTMENT MEASURES FOR IMPROVED SLUDGE TREATMENT AND DISPOSAL - Part 2 Rehabilitation and Upgrading of Irbid Central and Wadi Arab WWTPs
27/2019/SW
Lot 1: Construction of Waste Water Pumping Stations and Extension of Waste Water Networks in Hakama and Lot 2: Construction of Waste Water Pumping Stations and Extension of Waste Water Networks in Al Mughaier
28/2019/SW
CONSULTANCY FOR PROJECT IMPLEMENTATION Sewer System Karak
30/2019/SW
CONSULTANCY FOR PROJECT IMPLEMENTATION South-West Amman _ Jordan
29/2019/SW
Network Rehabilitation As-Salt Down Town (Naqab, Sawada)
26/2019/sw
Jordan Water PVs for Pumping Stations Project: Supervision Engineer & Implementation Support ( Reference No.: TCRS ID 6872 / TC ID 41584
14/2019/SW
Procurement Installation and Operation of Smart metering system
36/supply/2019
Climate Change Mitigation Measures in the Wastewater Sector in Jordan / For Accompanying Measures
149/2018/SW
Ain Ghazal Wastewater Project - Procurement Support & Construction Supervision
85/2018/SW / TCRS 1207/39185